DTP 2 Platform


ITER Divertor Maintenance:

  • Removal of cassettes
  • Transportation to/from hot cells
  • Installation of cassettes


DTP2 Platform Technologies:

  • Remote Control
  • Virtual Reality
  • Robotics
  • Water Hydraulics
  • Machine vision

Critical Issues:

  • Components are heavy (~10 t)
  • Flexibility of structures is inevitable
  • Clearances are small (<20 mm)
  • Camera view is very limited
  • Abnormal situations, e.g. jams, deformations
  • High number of processes and tools
  • Long and demanding development and testing time for each process and tool
    • requirements,
    • concept,
    • design,
    • virtual solution,
    • physical solution (software/hardware),
    • testing,
    • acceptance

 

DTP 2 Hall

DTP2 consists of infrastructure with specific hardware and software, but most of all experienced and skilled experts.


Updated by: Uusi-Heikkilä Janne, 07.12.2011 22:07.